NEWS ABOUT US VIDEOS
AZ
RU
ES

FUZULİ

20

JULY

2023

Acquaintance with the construction of the 27-kilometer section of the Ahmadbeyli–Fuzuli–Shusha highway

On July 20, during his visit to the Fuzuli district, President of the Republic of Azerbaijan Ilham Aliyev examined the construction of the 1st technical grade Ahmadbeyli–Fuzuli–Shusha highway’s 27-kilometer section up to the Fuzuli International Airport.

As part of the project for the reconstruction and restoration of the liberated territories, the construction project of the Ahmadbeyli–Fuzuli–Shusha highway is progressing rapidly. The length of the existing road is 101 kilometers, while the new road will be 81.7 kilometers long. The 48-kilometer section up to the Tugh circle will have six lanes, and the 33.7-kilometer section will have four lanes. Major infrastructure work has been fully completed on the 27-kilometer section that was inspected.

Insight Karabakh

Historical, political and legal aspects of the former Nagorno-Karabakh conflict

Armenian crimes

Armenian vandalism and crimes against the cultural heritage and natural reserves of Azerbaijan

Khojaly Today

Punitive crimes and vandalism of Armenia against civil population of Khojaly

Shusha today

“Motherland Garden” is full of flowers, including Kharibulbul

44-day war

The war to end all wars

Virtual Western Azerbaijan

Oghuz-Turkic heritage in Western Azerbaijan