NEWS ABOUT US VIDEOS
AZ
RU
ES

AĞDAM

3

OCTOBER

2021

Inauguration of the “Sugovushan-1” and “Sugovushan-2” Small Hydropower Plants

The “Sugovushan-1” and “Sugovushan-2” small hydropower plants in Tartar have been inaugurated after renovation. President of the Republic of Azerbaijan Ilham Aliyev attended the event and launched the stations on October 3.

13.8 million kWh of electric energy will be produced in Sugovushan-1 Small Hydroelectric Power Station annually. The total capacity of “Sugovushan-1” and “Sugovushan-2” Small Hydroelectric Power Stations in Sugovushan settlement of the Tartar region, liberated by the Azerbaijani Armed forces on October 3, 2020, is 7.8 megawatts. Both stations have been thoroughly reconstructed, and their control center buildings, equipment, and power transmission lines between the substations have been completely renewed.

Insight Karabakh

Historical, political and legal aspects of the former Nagorno-Karabakh conflict

Armenian crimes

Armenian vandalism and crimes against the cultural heritage and natural reserves of Azerbaijan

Khojaly Today

Punitive crimes and vandalism of Armenia against civil population of Khojaly

Shusha today

“Motherland Garden” is full of flowers, including Kharibulbul

44-day war

The war to end all wars

Virtual Western Azerbaijan

Oghuz-Turkic heritage in Western Azerbaijan